You have to pass the LEED Green Associate exam to receive the certification from USGBC. To increase the effectiveness of your study and make you familiar with the actual exam pattern, we have prepared this USGBC LEED Green Associate sample questions. Our Sample LEED Green Associate Practice Exam will give you more insight about both the type and the difficulty level of the questions on the USGBC LEED GA exam.
However, we are strongly recommending practice with our Premium Certified LEED Green Associate Practice Exam to achieve the best score in your actual USGBC LEED Green Associate Exam. The premium practice exam questions are more comprehensive, exam oriented, scenario-based and exact match of LEED Green Associate exam questions.
USGBC LEED Green Associate Sample Questions:
01. When project team members discuss the albedo of a product, to what are they referring?
a) Solar reflectance
b) Emissivity
c) Recycled content
d) VOC content
02. A developer wants to make a profit by building a new office that maximizes daylighting and views. What actions might the developer take to fulfill all parts of the triple bottom line?
a) Restore habitat onsite
b) Purchase ergonomic furniture
c) Pursue local grants and incentives
d) Provide lighting controllability for occupants
03. What should the project team do with the LEED Score Card once it has been completed?
a) Mail it to USGBC
b) Use it to determine the baseline building water use
c) Refer to it during the construction process
d) Use it to determine project soft-costs
04. How can a LEED project earn credit for Green Power?
a) By selecting a Green-e certified power provider
b) By purchasing biofuel based power
c) By installing solar panels
d) By purchasing any renewable energy source
05. Which of the following are LEED strategies to reduce single occupant automobile transportation to the project site?
a) Increase the building density
b) Locate the project in a suburban area
c) Designate preferred parking spaces for carpools
d) Build the project on a brownfield
06. A construction waste management plan should address what items?
a) What materials should be diverted
b) Rapidly renewable materials
c) The use of certified wood
d) Source reduction
07. Why should a project team choose local products for construction?
a) Increased source reduction
b) Increased durability
c) Reduced transportation costs and transportation emissions
d) Higher quality materials
08. When applying for innovation credits, a project team
a) Cannot submit any previously awarded innovation credit.
b) May receive credit for performance that doubles a credit requirement threshold.
c) May submit a product or strategy that is being used in an existing LEED credit.
d) May receive a credit for each LEED AP who is on the project team.
09. In a state with a closed electricity market, how can off-site green power be purchased?
a) Through an ENERGY STAR approved utility provider
b) Purchase power from a USGBC approved provider
c) Have certified wood scraps delivered onsite for burning
d) Enroll in a Green-e renewable power program from the utility provider
10. What design decisions would help reduce the quantity or improve the quality of stormwater runoff?
a) Using drip lines for irrigation
b) Adding a constructed wetland
c) Replacing all roads and hardscapes with impervious asphalt
d) Placing the building next to a park or other natural area
Answers:
Question: 01
Answer: a |
Question: 02
Answer: d |
Question: 03
Answer: c |
Question: 04
Answer: a |
Question: 05
Answer: c |
Question: 06
Answer: a |
Question: 07
Answer: c |
Question: 08
Answer: b |
Question: 09
Answer: d |
Question: 10
Answer: b |
If you find any errors or typos in Certified LEED Green Associate sample question-answers or online USGBC LEED GA practice exam, please report them to us on feedback@processexam.com